You choose, we deliver
If you are interested in this story, you might be interested in others from The Journal Gazette. Go to www.journalgazette.net/newsletter and pick the subjects you care most about. We'll deliver your customized daily news report at 3 a.m. Fort Wayne time, right to your email.

Police and fire

  • Video shows mom punching boy, 14
    A Grabill woman faces criminal charges after police said she was recorded on video punching her 14-year-old son in the face and stomach and unleashing a tirade of vulgarities at him.Meagen T.
  • Mother faces felony after bruises on son
    A Fort Wayne mother was charged with a felony after accusations she hit her child hard enough with her hand to leave significant bruising, including fingerprint impressionsLindsay Olson, 28, of the 2700 block of Witchwood Drive, was
  • Woman walking on Werling is robbed
    She was targeted and robbed because she walked alone at night.One man grabbed her, held something against her back and told her to shut up while another man rifled through her pockets and stole her cellphone.
Advertisement
Ben Mikesell | The Journal Gazette
Firefighters pull a construction barge away from the St. Joseph Dam after it came loose Thursday.

Runaway barge wrangled

Broke free from bridge project on St. Joe River

– When the Fort Wayne Fire Department got a call Thursday afternoon that they were needed on the St. Joseph River, it wasn’t because someone was struggling in the water.

In fact, there wasn’t a person, pet or any living creature involved with the task at hand.

That’s because what they had to wrangle with in the St. Joseph River was a barge loaded with concrete and metal that broke free from an upriver construction site.

“That was new and unusual,” Elbert Starks, assistant chief for the department, said of the afternoon’s events.

Shortly before 2:30 p.m., the department was called to the St. Joseph Dam near North Anthony and Coliseum boulevards.

When firefighters arrived, they found a large barge with concrete and metal piled atop it drifting aimlessly toward the dam.

Firefighters tried to tie the barge to a rescue boat with an outboard engine in an attempt to keep it from breaking through the dam and continuing downriver.

Their first attempt was successful but short-lived, as the barge again started to drift toward the dam.

One of the firefighters in the boat used a rope and pulled the barge away from the dam and back to the boat, which then made the slow journey toward the Coliseum Boulevard bridge near IPFW, where the barge was formerly secured.

Starks said an employee of Primco, the construction company contracted to do the bridge project, got in another boat and helped the fire department finish the tow.

By the end of the afternoon’s events, the barge was once again secured on the west bank of the river north of the bridge.

Starks said the department originally received information that a couple of kayakers might have loosened the barge, but it could not confirm those reports.

Without any evidence that the barge was set adrift as a result of intentional negligence or some other deliberate act, the department will not have any recourse for restitution for the time and resources it used for the operation.

The construction on Coliseum Boulevard’s bridge includes the addition of travel lanes. Once finished, the street also known as Indiana 930 will be three lanes between Parnell and Crescent avenues, with a left-turn lane into IPFW from eastbound Coliseum Boulevard.

Primco was awarded the contract with a bid of $6.1 million. The project is scheduled for completion by late November, weather permitting, according to the Indiana Department of Transportation.

cmeyers@jg.net

Advertisement